Exterior Site Improvement Project | November 12 – February 28, 2025 (actual dates may fluctuate based on weather and other conditions) |
Architectural Design Team: | Liro-Hill |
General Contractor: | Vintage Properties, Inc. |
Wayland Facilities manager: | Mike Faia |
Description: | New handicap-accessible walkway from the lower parking lot to a covered, automated entrance into the
|
| Children’s Room, allowing wheelchair access to the entire lower level of the Library, including the Children’s Room, the Raytheon Room and the public restrooms. |
| New stairs and railings from the north side of the Library to the automated entrance into the Children’s Room on the lower level. |
| New exterior lighting. |
| Improved drainage. |
| New plant beds and native plantings (Spring 2025). |