Please ensure Javascript is enabled for purposes of website accessibility
Skip to content
ATTENTION: The Main Floor of the Library will have a DELAYED OPENING on 10/21 and 10/22 - and open at 1pm on both days. Th Children's Room will be open normal hours and can be accessed by the entrance on the right side of the building.

Feasibility Study Committee 2003-2005

The Library Feasibility Study Committee studied the feasibility of expansion of the library. The report of the Feasibility Study Committee was handed out at Annural Town Meeting in 2005.

Documents generated by the Feasibility Study Committee include:

Library Planning Committee 2002

  • LPC Report April 2002 – To lay the groundwork for our Library Feasibility Study, the LPC developed an assessment (in 2002) of our community’s vision of needs for Wayland’s public library of the future.